
Project Profile: Dairyland Power Cooperative Solar Portfolio
Portfolio Size: 24 MW
Type: Ground Mount
Number of Sites: 17
Locations: Wisconsin, Iowa, Minnesota, Illinois
Project Timeframe: 2016–2019
Professional Services Provided:
Project Partners:
ENGIE has successfully implemented its flexible, multi-site strategy with a number of utility and electric cooperative clients. Dairyland Power and ENGIE collaborated to build a 21.1 MW portfolio of ground mount projects across 15 sites in Wisconsin, Iowa, and Minnesota with construction beginning in 2016. ENGIE DS developed, constructed, and now operates the 21.1 MW. An additional 3 MW is being constructed in Iowa and Illinois in 2019. Most of the Dairyland project locations were selected in collaboration the local member co-ops; ENGIE also worked to develop several alternative sites for each member co-op in the portfolio.
Download a PDF of the Power Cooperative Solar Project Profile
For more information, contact:
Laura Caspari
Director of Origination, ENGIE Distributed Solar
312.859.3951